
Job Weight: 89, 840kg
We had been instructed by the client to undertake GA & Fabrication drawings to this steel building, for an extension to an existing property. the connection design had already been undertaken by the clients engineer. We had a tight deadline on this but managed to hit this time ahead of schedule. This was a 3 Story – 6 Phased Steelwork project that was to be completed within 6 Months.
Ready to Start Your Project?
Let’s bring your design to life. Get in touch today for a free consultation and discover how our detailing expertise can save you time, money, and headaches on-site.
WRITE TO US